| Present Location |
Ffestiniog and Welsh Highland Railways |
| Designed For |
Industrial |
| Type & Original Water Capacity (gallons) |
C2 Standard 1144 gallons |
| Original Coal Capacity (tons) |
2 |
| Chassis Build Year |
1988 |
| Chassis Type |
C2 Standard 3 axle |
| Gauge |
1 ft 11 1/2' |
| Scoop Fitted |
Unspecified |
| Allocated To |
4 C2 class 0-8-0 |
| Present Number |
Un numbered |
| Owner |
C2 Project |
| Status |
Under Restoration / Overhaul |
| Additional Notes |
Built for 2'6' gauge. Imported to the UK in 2006. The original tank has been removed and has been replaced with a new design, the original frames were kept. The tender was Harbin Forest and Machinery works number 221. The top picture shows the frames upside down still attached to the floor of the tank. |
| Main Photo Taken By |
Justin Edwards |
| Date of Image |
12/10/2014 |
| Record Last Updated |
28/04/2024 |