| Present Location |
Severn Valley |
| Designed For |
GWR |
| Type & Original Water Capacity (gallons) |
Collett 4000 gallon |
| Original Coal Capacity (tons) |
6 |
| Chassis Type |
Collett 3 axle (later type) |
| Wheelbase |
7ft 6in + 7ft 6in |
| Gauge |
4ft 8 1/2in |
| Tank Fitted Date |
2019 |
| Current Water Capacity (gallons) |
4000 |
| Current Coal Capacity (tons) |
6 |
| Allocated To |
4930 GWR Hall class 4-6-0 |
| Present Number |
2399 |
| Owner |
Severn Valley Railway (Holdings) PLC |
| Status |
Operational |
| Locomotives Used with this Tender |
November 1975 - October 2013 6990 GWR Modified Hall 4-6-0vvv vvvOctober 2013 - to present 4930 GWR Hall 4-6-0 |
| Additional Notes |
Original tank removed by late September 2014. A new all welded tank with dummy rivets built by Adam Dalgleish Engineering of Stockton fitted in 2019. Front section of frame and dragbox has also being replaced. Photo at bottom shows tender with original tank. |
| Main Photo Taken By |
Ben Scott |
| Date of Image |
17/09/2022 |
| Record Last Updated |
22/09/2022 |